More of existing conditions

Thursday, September 24, 2009 at 12:22 AM





These are the final exterior conditions of Club Luz

Massing of existing conditions

at 12:15 AM











These are my massing models of existing conditions with new conditions

Second Attempt

Friday, September 18, 2009 at 5:22 PM
Ground Floor 2.1



Second Floor 2.1

This is my second attempt. I have change the flow of traffic.
The traffic flow is meant to go in the following order:
Entrance
check in your coat
make a decision of :
sit-down and eat, Dance, or Drink at the bar.
The bar consist of a information desk as well.
The stage has a 360 performance area but in the winter it turns to 180
The kitchen has a back door for the food.(even do its not drawn)
The office on the second floor has axes to an emergency stair.
Note: This club has no name for now. The first name
that comes to mind is Club Luz
Luz-Spanish for light.
Type of Music
All.

First Attempt

at 5:14 PM

Ground Floor 1.1



Second Floor 1.2


My fist attempt to reflect light and use it as a floor plan


Consept

at 4:18 PM

my concept consist of the study of light reflection. I am interested in the different reaction light has to different material.

Map of race

Monday, September 7, 2009 at 3:27 PM

Means of egress

at 3:14 PM
Means of egress in case of a fire


This is a test to determine how fast can a human run to safety without any alcohol influence.

Site Video

at 3:06 PM

Pictures

at 12:13 PM